2014

Los Cóndores Hydroelectric Power Plant- ENEL

For the first time, ENEL outsources the technical inspection of a subway run-of-river hydroelectric plant and it does so in a consortium of which CyD Ingeniería is a member. It is Los Cóndores, with an installed capacity of 150 MW. Which uses water from Laguna del Maule, through a 12-kilometer adduction tunnel built with TBM (Tunnel Boring Machine), delivering energy equivalent to the demand of 200,000 homes.