Client

MOP Concesiones

Starting year

2017

End date

01/09/2021

Fiscal Inspection Advisory Services (AIF) | Review of the detailed engineering developed by the concessionaire for the construction of the La Punilla reservoir and related works. The main characteristics are: a 137-meter-high CFRD dam with 5.1
million m3 of fill; a total reservoir volume of 625 hm3.

Leave a Reply

Your email address will not be published. Required fields are marked *