Client
MOP Concesiones
Starting year
2017
End date
01/09/2021
Fiscal Inspection Advisory Services (AIF) | Review of the detailed engineering developed by the concessionaire for the construction of the La Punilla reservoir and related works. The main characteristics are: a 137-meter-high CFRD dam with 5.1
million m3 of fill; a total reservoir volume of 625 hm3.