Client

Eólica Monte Redondo S.A

Starting year

2010

End date

01/05/2011

Technical inspection of construction work | Technical inspection and comprehensive control service for the expansion of five wind turbines added to the 19 already in operation. Each has a nominal capacity of 2 MW, bringing the total capacity of the
farm to 48 MW. The farm is located 326 km from Santiago, in the fourth region, in the municipality of Ovalle.

Leave a Reply

Your email address will not be published. Required fields are marked *