Client
MOP Dirección Obras Portuarias
Technical advice for tax inspection Pier with a 100-meter-long transparent ramp, consisting of 50 16-inch piles, longitudinal and transverse beams, reinforced concrete slab plus 30 meters of prefabricated ramp, elastomeric fenders and bollards, esplanade composed of reinforced concrete L-shaped walls and rockfill protection, passenger shelter, 6000 m2 of pavement for use by larger ships. Land works, constructing a 6,000 m² esplanade, which houses parking areas, green areas, and common areas for vehicular and pedestrian traffic, adding a 270 m² passenger shelter, reinforced with passenger waiting areas, a cafeteria, public restrooms, among others.