Client

Santiago Metro

Starting year

2015

End date

01/10/2018

Detailed engineering Detailed engineering for line 3 and 6 workshops, including designs, reviews, and solution planning. Additionally, supervision of works in line 3 and 6 workshops is included. The development of engineering instructions for line 3 workshops is also included.

Leave a Reply

Your email address will not be published. Required fields are marked *