Client

Santiago Metro

Starting year

2022

End date

01/03/2023

Detailed engineering The conceptual and basic engineering of the project considered an approximate extension of 3 km, with a route extending from the current maneuvering tail located west of Cerrillos Station to the new maneuvering tail planned southwest of the Lo Errázuriz bridge. Metro requests the consultant to provide new basic engineering for Lo Errázuriz Station with different simulations or coordination scenarios with the State Railway Company (EFE) for Lo Errázuriz Station.