Client

CDM Smith

Starting year

2018

End date

01/01/2020

Owner Team Support (OTS) | Field engineering services, technical inspection of works, document control, occupational health and safety, quality, pre-commissioning, commissioning, start-up, folder supervision, storage management, labor relations for the expansion of the existing desalination plant in the port of Coloso, adding 833 liters per second, increased water pumping capacity of 4 high-pressure stations, increased capacity of the high-voltage power supply system, new 13 km water pipeline at the MEL site, and installation of new 36″ desalinated water distribution pipeline from the reservoir to the existing fresh water transport pipeline.