Client
CDM Smith
Starting year
2018
End date
01/01/2020
Owner Team Support (OTS) | Field engineering services, technical inspection of works, document control, occupational health and safety, quality, pre-commissioning, commissioning, start-up, folder supervision, storage management, labor relations for the expansion of the existing desalination plant in the port of Coloso, adding 833 liters per second, increased water pumping capacity of 4 high-pressure stations, increased capacity of the high-voltage power supply system, new 13 km water pipeline at the MEL site, and installation of new 36″ desalinated water distribution pipeline from the reservoir to the existing fresh water transport pipeline.
Gerente de área
SERGIO SILVESTRE A.
Mining Manager – Northern Region
Civil Engineer
FELIPE ALVARADO
Mining Manager – Southern Region
Civil Engineer