Client
Enel
Starting year
2014
End date
01/03/2024
Technical inspection of construction work | Through CDZ, the contract aims to provide technical inspection and oversight of the contractor building the hydroelectric power plant, which will be located in the upper Maule River basin, in the Maule region, province of Talca, municipality of San Clemente, in an area approximately 16 km long, starting from the mouth of the Maule Lagoon to the Cuesta Arenas sector. The generation capacity is 150 MW. It also includes 70 km of high-voltage line with 299 towers to the Ancoa substation.