Client

Norvid S.A

Starting year

2008

End date

01/08/2009

Technical inspection of works | Inspection and management of the construction of the wind farm, which has 23 Vestas wind turbines (80 meters high and 90 meters in diameter) with a capacity of 2 MW each. The wind farm is located in Canela, IV Region of Coquimbo, 295 km north of Santiago. It was built under the Non-Conventional Renewable Energy Law (ENRC) and contributes its total power to the National Electric System (SEC). Totoral was registered in December 2010 under the Clean Development Mechanism (CDM) of the United Nations Framework Convention on Climate Change.

Leave a Reply

Your email address will not be published. Required fields are marked *