Client
GESVIAL
Starting year
2016
End date
01/01/2018
Technical Inspection of Works | Improvement of the Lo Saldes – Pérez Zujovic Interchange:
The Concessionaire Company must carry out this improvement, which consists of the construction of a new bridge over the Mapocho River in the west–east direction and a tunnel in the east–west direction to provide express connections between Av. Kennedy and Costanera Norte; the expansion of the Pérez Zujovic Roundabout; and the modification of existing connections toward the future Costanera Sur.
The main works include:
-
Costanera Norte viaduct connecting Costanera Norte with the future Kennedy Tunnel
-
Tunnel beneath the Mapocho River, east–west direction
-
Lo Saldes Tunnel
-
Costanera Sur underpass
-
Pérez Zujovic South underpass (Axes C6K and C8K)
-
Pérez Zujovic North Bridge
-
Costanera Sur Works (CS) and its connections:
-
Kennedy Tunnel beneath Av. Kennedy, between Américo Vespucio and the Pérez Zujovic Roundabout, serving as the express roadway in the west–east direction
-
Retaining the surface express roadway east–west
-
Construction of a two-lane service road parallel to the east–west express lane, running continuously between Américo Vespucio and Vitacura
-