Client
Engie
Starting year
2019
End date
01/05/2022
Technical inspection of works | The project consists of the construction of a photovoltaic plant of approximately 90 MW, consisting of crystalline silicon solar panels. The energy generated at the plant will be fed into the National Electric System through a 33/110 kV step-up substation that will connect to the existing Capricornio 220/110 kV substation.